Data Upload Scheduling Based on Demand

1. Data Scheduling and Execution Time:

  • Data Upload Timing: The business teams determine when and how frequently data should be uploaded. Available options include:
  • Daily uploads
  • Weekly uploads
  • Real-time data updates
  • Planning Based on Data Needs: The upload schedule should be optimized according to business processes. Our technical team provides recommendations on the most suitable upload times based on system performance.

2. Data Transfer Process:

  • Data is transferred to BigQuery at predefined intervals (real-time or periodic updates).
  • To prevent data loss, SenkronData verifies the data before and after uploading.

Data Validation:

  • After the data is uploaded, an automated validation file is sent via email to designated teams.
  • This validation method ensures quick resolution of missing data issues.

3. Data Updates:

  • Data Update Strategy:
  • Overwriting existing product data
  • Adding new records
  • Both teams define the update strategy together, and we automate this process.

4. Total BigQuery Integration Duration:

  • Once our experienced team maps data fields and relationships, the entire integration process is completed within 10 business days.